Hi Simon,
I'm going to base my control box build around yours but without the circuitry for switching the mains over between the two outputs. I will be using a ring main and can power each heater element from a separate 240v supply. I'm also going to add a 12v 1A power supply and a pot to control the speed of the 14w solar pump I've bought.
The input to the two pid controllers will from their respective mains inputs via a 16A illuminated rocker switch then through a 13A fuse and then direct to the pid controller. My concern was a 3Kw element is going to draw 12.5 A which is close to the fuse rating. Have you fused each of your pid controllers and have you had any problems fusing when on the copper boil cycle?
Cheers
Steve
I'm going to base my control box build around yours but without the circuitry for switching the mains over between the two outputs. I will be using a ring main and can power each heater element from a separate 240v supply. I'm also going to add a 12v 1A power supply and a pot to control the speed of the 14w solar pump I've bought.
The input to the two pid controllers will from their respective mains inputs via a 16A illuminated rocker switch then through a 13A fuse and then direct to the pid controller. My concern was a 3Kw element is going to draw 12.5 A which is close to the fuse rating. Have you fused each of your pid controllers and have you had any problems fusing when on the copper boil cycle?
Cheers
Steve