this morning i have finished doing the outside waterproof membrane, some was left over, so chucked it on whilst i have it, thats the outside ready for the featherboarding.
Inside i have finished the kickboard for the bar, thats ready for the metal piping to go on, once i have the brackets that is.
I have put in 2 support posts inside the shed, either side of the support beam, just because i had them! lol
Am about to start on fixing up the guttering next, but unsure, as the heat bouncing of the back if the shed at the moment is unreal.
Inside the 12 by 6 shed , the temperature in there is 44c, its unbearable in there, so doors are open, in the 'pub shed', its 21c, and thats without the air con on, it is lovely and cool in there.
Once the rest of the interior walls are finished, should be quiet cool in there, and the boarding is being collected in the morning!!!