So, a little bit further along in been able to continue with this build. Received some more of the parts ordered for my controller build.
I have some more parts arriving tonight (I already have a second hot condition kettle lead).
Now however I am at a point where I need a bit of advice. I've come up with the following circuit for the build. The switches are 4 pin illuminated DPST rocker switches, rated for 16A at 240v, so should be able to handle the current draw (if they can't, then the fuse in the plug into the wall socket is going to blow... lol). These switches are designed to have the neutral pass through them (in order to power the illumination) but only switch the live (I've dried to indicate this on the circuit diagram).
I want to include the voltage control for both mash and boil, but want to be able to bypass AND isolate the SSR from the AC mains current. The idea been that when it comes to boil I isolate the SSR and close the direct path to the voltage control. This way the PID should continue to function during the boil, and more importantly when cooling the wort, but as a temperature readout only. The voltage control is because I am 90% certain that the 2.4kw element will be too much to maintain temps during the mash without scorching, and I also found previously that 2500 watts was a truly insane boil (with my old boiler), and I don't believe for one minute that a reduction of just 100 watts is going to be enough. So I want to be able to run at reduced power when mashing, and also to be able to control the boil better.
Probe will be mounted before the pump, after the tap. For now anyway. Reason for this is I want to use the PID to read the temperature of the wort whilst cooling. Now when cooling I DO use recirculation to speed this up, but I DON'T use the lid, so I can't mount it on the return if I want to do this. At some point I will probably add a hole and mount a probe into the body of the boiler, and switch which probe I use when mashing and when boiling.
Anyway, this is the plan at the moment. I've not put the temp probe on there as didn't feel a need to.
If it turns out that I don't need it during the boil, I'll just remove it from the boil circuit, whilst keeping it in the mash circuit., like this:-
Thoughts?
Oh and no main power switch, for the simple reason that if I want to turn off the main power I'll unplug it... lol No pump control either, as I wanted to start simple, I can always add pump control later.