My engineer just left. He couldn't install my smart meters as I had what he called a biscuit tin. A metal casing and live exposed wires which is unsafe and needs replacing with a plastic one apparently. Somebody had built a piece of board in front of it as well so he couldn't see without taking the board off. We've put it down to the non-standard construction of the house which we found out when we tried to get a mortgage on it.
He said it could have asbestos within it which would get disturbed when he tried to remove the meter as well (thankfully when he checked it hadn't). He said it was a code B03. I'm sure @Donegal john will understand some of this.
Now we have to wait until they've replaced the metal bit for a plastic one, before we can have any type of meter put in. Uff lol
He said it could have asbestos within it which would get disturbed when he tried to remove the meter as well (thankfully when he checked it hadn't). He said it was a code B03. I'm sure @Donegal john will understand some of this.
Now we have to wait until they've replaced the metal bit for a plastic one, before we can have any type of meter put in. Uff lol