I'm planning a few brewery upgrades in the near future, including a Bergland thermo pot tun from ebay. I'm looking at the 70L, but it looks like it already has a tap fitted. Is this easy to switch out for a new valve, or does the hole require re-cutting?
I'd prefer to do the bottom drain mod, but if there's already a hole in the side then I guess that's probably the easiest way to go. Thoughts?
Either way, more shiny coming soon
I'd prefer to do the bottom drain mod, but if there's already a hole in the side then I guess that's probably the easiest way to go. Thoughts?
Either way, more shiny coming soon