The shed brewery

The Homebrew Forum

Help Support The Homebrew Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
done some more empyting and rearranging today and got the 2nd fridge in place. will hopefully get some pics tomorrow starting to take shape :thumb:
 
few more bits done, fridges both in place now. 3 tier stand built up and shelving sorted out along with the old fermenting cupboard for more storage. hopefully get the sink made up tomorrow and bit of a tidy up.







 
slats on brewstand and the shelves have been varnished today but not much else.
 
wish I could mate but have none ready, only got an old peculiar clone that's just gone into the cold for a bit after carbing up and it isn't brilliant at the minute, have been testing along the way though lol. forgot to mention also won an cooker extractor hood on ebay this morning for £10 brand new so ill be fetching that tomorrow :D
 
danb said:
the electrics are in and working for the hlt, boiler and fan and also got the sockets, light and supply in the new shed all working. managed to acquire 4ft of worktop aswell to go in the brewshed and fitted a small work bench in the new shed.
Looking good. Sooo jealous fella, would love a shed to brew in but unfortunately there's a bloody 14ft trampoline in the way! Grrrrrr
 
wow very impresive.. :clap: .
your doing a great job ... :thumb: .

regards mick... :hat: .
 
am slowly getting it there. got the stand fixed in place and the cooker hood is fitted just need to fit the extraction hose and vent then I can fasten the chimney part on. switched it on to see if all was working and the motor really shifts the air, it was like gail force winds blowing off the roof and wall.
 
got a lot done today, got the homemade sink made up and mounted, cupboard emptied and filled with brewing gear the pots on the stand waiting to be piped up, worktop fitted and all the brewing stuff brought out from inside and got the stereo in and wired up.





 
your making a cracking job of the build....... :party: :party:
 
thanks its definitely starting to look a lot better. made the bench height and width so if needed, another 2 fridges should fit under there. just got to finish off the insulation and get some lino down on the floor then order 2 stc 1000s for the fridge.
 
wow you have done so much and it all looks great ...
well done you ... :clap: .

regards mick... :hat: .
 
nothing done in the shed today apart from bunging a fv with a wilkos dark velvet stout in. with a huge quilt wrapped round it as the cupboard has been sat at 15'c. going to do another biab of hopback summer lightning in the house later in the week as realised I am going away in 8 weeks and wont have enough time to get the shed finished and brewing in there ready in time to take away.
so at least ill have 21l of old peculiar, 23l stout and 21l of summer lightning to take with me. should be a fun week lol :drink:
 
ball valves are fitted on the pots and will be piped up tomorrow. should be fetching the ducting for the extractor in the morning and all being well there will be a brew on tomorrow afternoon. and got the flooring finished off today.
 