we decided we would get another shed to put most tools in and all the bikes etc so the original shed could be turned into the brewhouse instead of brewing in the kitchen and carrying up stairs to ferment in the bedroom.
it'll be a slow build over a few weeks due to low funds but cant wait for the first brew in there.
the 3 tier stand is nearly finished ready to go in.
water supply in today ready to be connected up.
sockets and cable ready to be added for hlt and boiler.
fermenting fridge in waiting for a tube heater and stc 1000.
homemade sink drain for washing out equipment.
planning on a few more fridges from freecycle for fermenting and conditioning in.
just got to wait for the new shed to come next week then finish the insulation off and can get cracking.
brewstand
650mm trench for water supply
it'll be a slow build over a few weeks due to low funds but cant wait for the first brew in there.
the 3 tier stand is nearly finished ready to go in.
water supply in today ready to be connected up.
sockets and cable ready to be added for hlt and boiler.
fermenting fridge in waiting for a tube heater and stc 1000.
homemade sink drain for washing out equipment.
planning on a few more fridges from freecycle for fermenting and conditioning in.
just got to wait for the new shed to come next week then finish the insulation off and can get cracking.
brewstand
650mm trench for water supply