So I thought I would document the planned 4 week build of my new brew shed/man cave/summer house.
First stage today was removing the years of crap thatââ¬â¢s been stored in the shed since we moved in 6 years ago. The shed is dying so needs to be completely demolished so I can start building a new timber framed building with a tiled roof, floor with vapour barrier and wall insulation.
Iââ¬â¢m going to build a 3 brick plinth on the concrete base with a DPC to make sure it lasts the test of time.
Plan is to have mains electricity and a connection for mains water and a soak away waste. With a dedicated worktop and sink area at the back for my BM and brew fridge(s).
Ordered all of the materials, French doors, windows and additional door earlier in the week. View attachment IMG_3438.jpgView attachment IMG_3439.jpgView attachment IMG_3441.jpgView attachment IMG_3440.jpgView attachment IMG_3437.jpgView attachment IMG_3434.jpgView attachment IMG_3432.jpg
Day 1 complete, day 2 is to remove the roof.
Sent from my iPad using Tapatalk
First stage today was removing the years of crap thatââ¬â¢s been stored in the shed since we moved in 6 years ago. The shed is dying so needs to be completely demolished so I can start building a new timber framed building with a tiled roof, floor with vapour barrier and wall insulation.
Iââ¬â¢m going to build a 3 brick plinth on the concrete base with a DPC to make sure it lasts the test of time.
Plan is to have mains electricity and a connection for mains water and a soak away waste. With a dedicated worktop and sink area at the back for my BM and brew fridge(s).
Ordered all of the materials, French doors, windows and additional door earlier in the week. View attachment IMG_3438.jpgView attachment IMG_3439.jpgView attachment IMG_3441.jpgView attachment IMG_3440.jpgView attachment IMG_3437.jpgView attachment IMG_3434.jpgView attachment IMG_3432.jpg
Day 1 complete, day 2 is to remove the roof.
Sent from my iPad using Tapatalk