SOLD
We are due to move house next year and unfortunately will not have room for my current brewery setup. My plan is to only bottle my beers so I am putting up for sale my home made Kegerator setup.
Full height larder fridge set up to take 4 x 19L kegs.
Comes complete with all required piping, individual regulators and disconnects to supply CO2 to 4 kegs.
Complete with 2 x standard taps and 1 beer engine.
Will come with many spare parts (Piping, connectors, seal kits etc)
Parts list
4 x 19l Kegland kegs
2 x Taps
1 x 4 way gas manifold (Feeds internal kegs)
1 x 2 way gas manifold (External gas supply)
All piping and disconnects for 4 kegs and two taps.
Additional piping and disconnect for external beer engine.
All set up and ready to connect to your CO2 supply. (Gas cyclinders not included).
Note: If you're quick.....one of the kegs is full with an Old Speckled Hen clone which will be ready to drink end of October.
£400 for the full setup ready to go.
Based in Cornwall.
We are due to move house next year and unfortunately will not have room for my current brewery setup. My plan is to only bottle my beers so I am putting up for sale my home made Kegerator setup.
Full height larder fridge set up to take 4 x 19L kegs.
Comes complete with all required piping, individual regulators and disconnects to supply CO2 to 4 kegs.
Complete with 2 x standard taps and 1 beer engine.
Will come with many spare parts (Piping, connectors, seal kits etc)
Parts list
4 x 19l Kegland kegs
2 x Taps
1 x 4 way gas manifold (Feeds internal kegs)
1 x 2 way gas manifold (External gas supply)
All piping and disconnects for 4 kegs and two taps.
Additional piping and disconnect for external beer engine.
All set up and ready to connect to your CO2 supply. (Gas cyclinders not included).
Note: If you're quick.....one of the kegs is full with an Old Speckled Hen clone which will be ready to drink end of October.
£400 for the full setup ready to go.
Based in Cornwall.
Attachments
Last edited: