Grainfather AG.
Water supply through garage wall to how pipe installed, for cleaning and cooler not water for beer
Ferment fridge: Sorted, just got to put plug on space heater and then stc fermenter fridge ready.
Drain to be planned for future but not now. Can lift sink out as it is a black plastic horse feed trough
Virgin brew this Sunday.
Drinking: None
Fermenting: None
Planning: Exe Valley Spring Beer. Ashbeck water adjusted 0.49g gypsum per litre for pale ale plus one camden tablet to mash water.