bobsbeer
Well-Known Member
Well my bits have started to arrive. It has taken a few of months in the planning, but hopefully the build can commence. The plan is to go nearly all automatic, with a micro controller at the heart of the system. Controlling 8 x 12v 2 way valves, 2 heating elements and 3 x 12 v pumps. The code for all this has been borrowed from the Brewtroller system. My wife has been going barmy and has said I need to move out if I don't get this project finished as it has been taking over the kitchen, as I tested all the various bits attached to my arduino. And she is also sick of answering the door as various bits have been arriving, mainly from China. Below is a plan for the control panel. I have laid it out with RGB led's so I can see what is going on. As I said earlier it is nearly automatic, but things like hop additions will be added manually at set times. The plan at this stage is just a single stage mash with batch sparging. So a manual valve has been incorporated to control the flow. If I want to upgrade to HERMS later I have the room in the box and plumbing system. I'll keep you posted on the build. As usual all this started with me deciding I needed to upgrade my plastic HLT. Then it grew and grew and grew. It's become a monster. But hopefully the result will be drinkable beer. :lol:
The components:
The components: