Hello all
Still mulling over a new system...been looking at three vessel now there's one bit I'm struggling with....
When the mash tun is sparged into the boiler is the boiler then lifted to the heat source with just the runnings in then topped up to boil volume?
Still mulling over a new system...been looking at three vessel now there's one bit I'm struggling with....
When the mash tun is sparged into the boiler is the boiler then lifted to the heat source with just the runnings in then topped up to boil volume?