plan for the weekend my bouncing squirrel.
First off I have to actually build my brewery as its now in a diffrent town and I dont have the old tower. Im thinking just this time use 2 black and decker work benches
Grist to be
5kg marris otter
1/2 kg crystal
50 gram Fuggles 90 min
40 challenger 90 min
30 gram challenger last 15 min
worflic if I can find them.
Will let you all know if I manage it or not as I also have had a bug for the past month that is not shifting
First off I have to actually build my brewery as its now in a diffrent town and I dont have the old tower. Im thinking just this time use 2 black and decker work benches
Grist to be
5kg marris otter
1/2 kg crystal
50 gram Fuggles 90 min
40 challenger 90 min
30 gram challenger last 15 min
worflic if I can find them.
Will let you all know if I manage it or not as I also have had a bug for the past month that is not shifting