I bet the taxpayers will be over the moon when they read this.
A failed plan to build a bridge covered with trees and flowers over the River Thames in central London cost a total of £53m, it has been revealed.
A Transport for London investigation showed The Garden Bridge Trust spent £161,000 on a website and £417,000 on a gala event for the abandoned project.
The design of the bridge cost more than £9m and the charity paid its executives a total of £1.7m.
Around £43m came out of the public's pocket, Transport for London added.
Doubts began to surround the project, overseen by Boris Johnson, after it lost the support of London Mayor Sadiq Khan in April 2017.
It was officially abandoned in August of that year after a review recommended it be scrapped.
https://www.bbc.co.uk/news/uk-england-london-47228698
A failed plan to build a bridge covered with trees and flowers over the River Thames in central London cost a total of £53m, it has been revealed.
A Transport for London investigation showed The Garden Bridge Trust spent £161,000 on a website and £417,000 on a gala event for the abandoned project.
The design of the bridge cost more than £9m and the charity paid its executives a total of £1.7m.
Around £43m came out of the public's pocket, Transport for London added.
Doubts began to surround the project, overseen by Boris Johnson, after it lost the support of London Mayor Sadiq Khan in April 2017.
It was officially abandoned in August of that year after a review recommended it be scrapped.
https://www.bbc.co.uk/news/uk-england-london-47228698